top of page
ABOUT
437922766_820124810137030_573447470721238575_n_edited.png

Send us a message
 and we’ll get back to you shortly.

PRODUCT

PRODUCTS

FullSizeRender-1.jpeg
Screen Shot 2020-10-25 at 4.18.15 PM.png
brickform.jpeg
download (2).png
Rapid-Set-9331c522cd218d19e9301e1dcbe351
forta.jpeg
fritz pak.jpeg
download.jpg
concria logo.jpeg
Screen Shot 2020-10-25 at 6.10.06 PM.png
opdbcgberilhwxn6tqml.webp
images (2).png
download.png
Screen Shot 2020-10-25 at 6.09.46 PM.png
images (1).png
images.jpg
download (4).png
download (3).png
Alabama pigments.jpeg
Ameripolish2_edited_edited_edited.jpg
33debd01da75bc107fe58b3ab9454e0f_edited.
Lythic-1.jpeg
solomon ultra fiber.jpeg
citra shield logo.jpg

AT Specialty Cements Monthly Blog:

Raising the efficiency on the jobsite - achieve better quality at less costs

Builder face challenges every day consisting of fulfilling a contract with quality and on time. The construction of concrete floors is one of the most common activities that requires large human resources, in a market of labor shortage, high inflation costs and intolerable heat makes this activity full of challenges. Employee-operated grading and compaction equipment gives the builder that efficiency needed to keep his profits healthy. The advantages of using the UNISCREED are significant, since one employee will do the work of four in less time and at a higher level of quality. The ability to consolidate and achieve surface flatness on a concrete floor surpasses the typical screed, vibrator and bull float brigade. Look at this table and see the difference calculated in over thousands of projects in the past ten years.

image1 (3).jpeg

Heat does lifelong damage to the density and durability of your floors and the tricks of wetting the surface with water create eternal dusting. You will gain 20 more minutes of cement paste in a plastic state to have more time for the final finish, achieving greater compression hardness and abrasiveness on the final surface. It is NOW a reality when using Day 1 in minutes before starting your finish and just at the same time that the bleeding ended.

image2 (2).jpeg
BLOG
SERVICES
PROJECTS

PROJECTS

More Projects

MEDIA

Teodoro_Moscoso_Bridge_Puerto_Rico-5.jpe

Fast-setting cement results in minimal traffic disruption for Teodoro Moscoso Bridge rehab

Article published by Roads&Bridges

Screen Shot 2020-01-03 at 3.28.46 PM.png

REPAIRING CORROSION AT THE MEDALLA LIGHT BEER FACILITY

Article by Sharon J. Rehana and published by Rapid Set

Screen Shot 2020-01-03 at 3.30.18 PM.png

PUERTO RICO INTERNATIONAL AIRPORT: Runway Repairs Returned Back to Service in Less Than Two Hours

Article published by Rapid Set

MEDIA
CONTACT

CONTACT

Inquiries

For any inquiries, questions or commendations, please call: +1 787-727-1663 or fill out the following form

Thanks for submitting!

Head Office

605 Calle Pedro de Castro, San Juan, 00910, Puerto Rico

 

atscements@gmail.com

Tel: +1 787-727-1663

Get a quote: +1 787-727-1663

bottom of page